US Bridges

Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn

Good

Honolulu County, Hawaii · 100 West of Moanalua Stm · Structure no. 003000H10201828

Built
1984
41 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,113 ft
17 main spans
Daily traffic
57,675
2007 count
Owner
State
State Highway Agency

About this bridge

Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn is a prestressed concrete stringer/multi-beam or girder carrying Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn in Honolulu County, Hawaii. It was built in 1984, so it is 41 years old, younger than the Hawaii average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 57,675 vehicles a day, projected to reach 80,585 by 2025. The structure is 1,113 ft (339.2 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp B (e.B) H1
CrossesKeehi I.C. Nimitz Conn
Location100 West of Moanalua Stm
RouteInterstate 92
StateHawaii
Coordinates21.3333, -157.89022
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.2 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans17
Design loadHS 20
Structure length1,113 ft (339.2 m)
Longest span100 ft (30.5 m)
Deck width29 ft (8.9 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic57,675 (2007)
Projected traffic80,585 by 2025
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn built?

It was built in 1984, making it 41 years old in 2025.

What condition is Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn carry?

About 57,675 vehicles per day (2007 count).

How long is Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn?

The structure is 1,113 ft (339.2 m) long with a longest span of 100 ft (30.5 m) and a deck 29 ft wide.

Who owns Ramp B (e.B) H1 over Keehi I.C. Nimitz Conn?

It is owned by the State Highway Agency.