US Bridges

US 441 (sbl)/Sr 29 over Commissioners Creek

Good

Wilkinson County, Georgia · In the City of Mcintyre · Structure no. 000000031950250

Built
2001
24 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
960 ft
22 main spans
Daily traffic
4,060
2024 count
Owner
State
State Highway Agency

About this bridge

US 441 (sbl)/Sr 29 over Commissioners Creek is a prestressed concrete stringer/multi-beam or girder carrying US 441 (sbl)/Sr 29 over Commissioners Creek in Wilkinson County, Georgia. It was built in 2001, so it is 24 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,060 vehicles a day, roughly 17% of them trucks, projected to reach 6,090 by 2032. The structure is 960 ft (292.6 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 441 (sbl)/Sr 29
CrossesCommissioners Creek
LocationIn the City of Mcintyre
RouteU.S. Route 441
StateGeorgia
Coordinates32.85027, -83.19337
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.9 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans22
Design loadHS 20 + Mod
Structure length960 ft (292.6 m)
Longest span120 ft (36.6 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,060 (2024)
Projected traffic6,090 by 2032
Trucks17%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$5.6 million
NavigationNo navigation control on waterway

Frequently asked questions

When was US 441 (sbl)/Sr 29 over Commissioners Creek built?

It was built in 2001, making it 24 years old in 2025.

What condition is US 441 (sbl)/Sr 29 over Commissioners Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does US 441 (sbl)/Sr 29 over Commissioners Creek carry?

About 4,060 vehicles per day (2024 count), of which roughly 17% are trucks.

How long is US 441 (sbl)/Sr 29 over Commissioners Creek?

The structure is 960 ft (292.6 m) long with a longest span of 120 ft (36.6 m) and a deck 41 ft wide.

Who owns US 441 (sbl)/Sr 29 over Commissioners Creek?

It is owned by the State Highway Agency.