US Bridges

Abutment Road over Tar Creek

Good

Whitfield County, Georgia · 1.7 MI S of Dalton · Structure no. 000000031300610

Built
1990
35 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
44 ft
3 main spans
Daily traffic
12,800
2024 count
Owner
County
County Highway Agency

About this bridge

Abutment Road over Tar Creek is a concrete culvert carrying Abutment Road over Tar Creek in Whitfield County, Georgia. It was built in 1990, so it is 35 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,800 vehicles a day, roughly 1% of them trucks, projected to reach 19,995 by 2031. The structure is 44 ft (13.4 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesAbutment Road
CrossesTar Creek
Location1.7 MI S of Dalton
RouteCity Street 1502
StateGeorgia
Coordinates34.74959, -84.96059
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length44 ft (13.4 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,800 (2024)
Projected traffic19,995 by 2031
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$469,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Abutment Road over Tar Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is Abutment Road over Tar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Abutment Road over Tar Creek carry?

About 12,800 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Abutment Road over Tar Creek?

The structure is 44 ft (13.4 m) long with a longest span of 14 ft (4.3 m).

Who owns Abutment Road over Tar Creek?

It is owned by the County Highway Agency.