US Bridges

SR 1 - US 27 (nbl) over Mcfarland Gap Road

Fair

Walker County, Georgia · 5 MI N of Chickamauga · Structure no. 000000029550990

Built
2001
24 years old
Condition
Fair
inspected February 2025
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
161 ft
1 main span
Daily traffic
14,600
2024 count
Owner
State
State Highway Agency

About this bridge

SR 1 - US 27 (nbl) over Mcfarland Gap Road is a prestressed concrete box beam or girders - single or spread carrying SR 1 - US 27 (nbl) over Mcfarland Gap Road in Walker County, Georgia. It was built in 2001, so it is 24 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,600 vehicles a day, roughly 5% of them trucks, projected to reach 20,295 by 2031. The structure is 161 ft (49.1 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 1 - US 27 (nbl)
CrossesMcfarland Gap Road
Location5 MI N of Chickamauga
RouteU.S. Route 27
StateGeorgia
Coordinates34.94321, -85.2778
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.9 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length161 ft (49.1 m)
Longest span161 ft (49.1 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,600 (2024)
Projected traffic20,295 by 2031
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$944,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 1 - US 27 (nbl) over Mcfarland Gap Road built?

It was built in 2001, making it 24 years old in 2025.

What condition is SR 1 - US 27 (nbl) over Mcfarland Gap Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does SR 1 - US 27 (nbl) over Mcfarland Gap Road carry?

About 14,600 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SR 1 - US 27 (nbl) over Mcfarland Gap Road?

The structure is 161 ft (49.1 m) long with a longest span of 161 ft (49.1 m) and a deck 43 ft wide.

Who owns SR 1 - US 27 (nbl) over Mcfarland Gap Road?

It is owned by the State Highway Agency.