US Bridges

SR 112 over Double Run Creek

Good

Turner County, Georgia · 1 MI SW of Rebecca · Structure no. 000000028750440

Built
2004
21 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
320 ft
2 main spans
Daily traffic
940
2024 count
Owner
State
State Highway Agency

About this bridge

SR 112 over Double Run Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 112 over Double Run Creek in Turner County, Georgia. It was built in 2004, so it is 21 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 940 vehicles a day, roughly 26% of them trucks, projected to reach 1,530 by 2031. The structure is 320 ft (97.5 m) long and 41 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR 112
CrossesDouble Run Creek
Location1 MI SW of Rebecca
RouteState Highway 112
StateGeorgia
Coordinates31.79555, -83.49814
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.9 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+4 approach)
Design loadHS 20 + Mod
Structure length320 ft (97.5 m)
Longest span80 ft (24.4 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic940 (2024)
Projected traffic1,530 by 2031
Trucks26%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.9 million
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 112 over Double Run Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is SR 112 over Double Run Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does SR 112 over Double Run Creek carry?

About 940 vehicles per day (2024 count), of which roughly 26% are trucks.

How long is SR 112 over Double Run Creek?

The structure is 320 ft (97.5 m) long with a longest span of 80 ft (24.4 m) and a deck 41 ft wide.

Who owns SR 112 over Double Run Creek?

It is owned by the State Highway Agency.