US Bridges

Alberson Road over I-75@88.13N

Good

Turner County, Georgia · 6 MI N of Ashburn · Structure no. 000000028700260

Built
1958
67 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
263 ft
4 main spans
Daily traffic
30
2024 count
Owner
State
State Highway Agency

About this bridge

Alberson Road over I-75@88.13N is a prestressed concrete stringer/multi-beam or girder carrying Alberson Road over I-75@88.13N in Turner County, Georgia. It was built in 1958, so it is 67 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, roughly 1% of them trucks, projected to reach 75 by 2031. The structure is 263 ft (80.2 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAlberson Road
CrossesI-75@88.13N
Location6 MI N of Ashburn
RouteCounty Highway 159
StateGeorgia
Coordinates31.78833, -83.69188
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating31 US tons
Inventory rating19 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length263 ft (80.2 m)
Longest span68 ft (20.7 m)
Deck width30 ft (9.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2024)
Projected traffic75 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Alberson Road over I-75@88.13N built?

It was built in 1958, making it 67 years old in 2025.

What condition is Alberson Road over I-75@88.13N in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Alberson Road over I-75@88.13N carry?

About 30 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Alberson Road over I-75@88.13N?

The structure is 263 ft (80.2 m) long with a longest span of 68 ft (20.7 m) and a deck 30 ft wide.

Who owns Alberson Road over I-75@88.13N?

It is owned by the State Highway Agency.