US Bridges

I-85 (nbl) over CR 413 Webb Road

Good

Troup County, Georgia · 2.5 MI NE of West Point · Structure no. 000000028500540

Built
1966
59 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
185 ft
3 main spans
Daily traffic
36,200
2024 count
Owner
State
State Highway Agency

About this bridge

I-85 (nbl) over CR 413 Webb Road is a steel stringer/multi-beam or girder carrying I-85 (nbl) over CR 413 Webb Road in Troup County, Georgia. It was built in 1966, so it is 59 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 36,200 vehicles a day, roughly 1% of them trucks, projected to reach 45,225 by 2032. The structure is 185 ft (56.4 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-85 (nbl)
CrossesCR 413 Webb Road
Location2.5 MI NE of West Point
RouteInterstate 85
StateGeorgia
Coordinates32.91104, -85.12028
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating36.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length185 ft (56.4 m)
Longest span71 ft (21.6 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic36,200 (2024)
Projected traffic45,225 by 2032
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-85 (nbl) over CR 413 Webb Road built?

It was built in 1966, making it 59 years old in 2025.

What condition is I-85 (nbl) over CR 413 Webb Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-85 (nbl) over CR 413 Webb Road carry?

About 36,200 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-85 (nbl) over CR 413 Webb Road?

The structure is 185 ft (56.4 m) long with a longest span of 71 ft (21.6 m) and a deck 40 ft wide.

Who owns I-85 (nbl) over CR 413 Webb Road?

It is owned by the State Highway Agency.