US Bridges

SR 86 over I-16 (sr 404)

Good

Treutlen County, Georgia · 6.3 MI NE of Soperton · Structure no. 000000028350390

Built
2022
3 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
284 ft
4 main spans
Daily traffic
390
2024 count
Owner
State
State Highway Agency

About this bridge

SR 86 over I-16 (sr 404) is a prestressed concrete stringer/multi-beam or girder carrying SR 86 over I-16 (sr 404) in Treutlen County, Georgia. It was built in 2022, so it is 3 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 390 vehicles a day, roughly 32% of them trucks, projected to reach 555 by 2032. The structure is 284 ft (86.6 m) long and 35 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesSR 86
CrossesI-16 (sr 404)
Location6.3 MI NE of Soperton
RouteState Highway 86
StateGeorgia
Coordinates32.43394, -82.50997
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.9 US tons
Inventory rating46 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length284 ft (86.6 m)
Longest span97 ft (29.6 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic390 (2024)
Projected traffic555 by 2032
Trucks32%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 86 over I-16 (sr 404) built?

It was built in 2022, making it 3 years old in 2025.

What condition is SR 86 over I-16 (sr 404) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR 86 over I-16 (sr 404) carry?

About 390 vehicles per day (2024 count), of which roughly 32% are trucks.

How long is SR 86 over I-16 (sr 404)?

The structure is 284 ft (86.6 m) long with a longest span of 97 ft (29.6 m) and a deck 35 ft wide.

Who owns SR 86 over I-16 (sr 404)?

It is owned by the State Highway Agency.