US Bridges

CR 418 over I-75 (exit 55)

Good

Tift County, Georgia · 7 MI S Tifton · Structure no. 000000027750830

Built
2014
11 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
260 ft
2 main spans
Daily traffic
1,470
2024 count
Owner
State
State Highway Agency

About this bridge

CR 418 over I-75 (exit 55) is a prestressed concrete stringer/multi-beam or girder carrying CR 418 over I-75 (exit 55) in Tift County, Georgia. It was built in 2014, so it is 11 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,470 vehicles a day, roughly 1% of them trucks, projected to reach 1,095 by 2031. The structure is 260 ft (79.2 m) long and 57 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR 418
CrossesI-75 (exit 55)
Location7 MI S Tifton
RouteCounty Highway 2591
StateGeorgia
Coordinates31.35843, -83.49013
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating80.9 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length260 ft (79.2 m)
Longest span130 ft (39.6 m)
Deck width57 ft (17.4 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,470 (2024)
Projected traffic1,095 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$34.6 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 418 over I-75 (exit 55) built?

It was built in 2014, making it 11 years old in 2025.

What condition is CR 418 over I-75 (exit 55) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does CR 418 over I-75 (exit 55) carry?

About 1,470 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is CR 418 over I-75 (exit 55)?

The structure is 260 ft (79.2 m) long with a longest span of 130 ft (39.6 m) and a deck 57 ft wide.

Who owns CR 418 over I-75 (exit 55)?

It is owned by the State Highway Agency.