US Bridges

SR 125 Tift Avenue over New River Trib

Good

Tift County, Georgia · North Section of Tifton · Structure no. 000000027750700

Built
2000
25 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
40 ft
4 main spans
Daily traffic
10,300
2024 count
Owner
State
State Highway Agency

About this bridge

SR 125 Tift Avenue over New River Trib is a concrete culvert carrying SR 125 Tift Avenue over New River Trib in Tift County, Georgia. It was built in 2000, so it is 25 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,300 vehicles a day, roughly 9% of them trucks, projected to reach 16,425 by 2031. The structure is 40 ft (12.2 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 125 Tift Avenue
CrossesNew River Trib
LocationNorth Section of Tifton
RouteState Highway 125
StateGeorgia
Coordinates31.46576, -83.50302
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20 + Mod
Structure length40 ft (12.2 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,300 (2024)
Projected traffic16,425 by 2031
Trucks9%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$298,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 125 Tift Avenue over New River Trib built?

It was built in 2000, making it 25 years old in 2025.

What condition is SR 125 Tift Avenue over New River Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR 125 Tift Avenue over New River Trib carry?

About 10,300 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is SR 125 Tift Avenue over New River Trib?

The structure is 40 ft (12.2 m) long with a longest span of 9 ft (2.7 m).

Who owns SR 125 Tift Avenue over New River Trib?

It is owned by the State Highway Agency.