Macedonia Ch RD over Little Horse Creek
GoodTelfair County, Georgia · 10.6 MI SE of Milan · Structure no. 000000027150330
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 240
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Macedonia Ch RD over Little Horse Creek is a prestressed concrete box beam or girders - multiple carrying Macedonia Ch RD over Little Horse Creek in Telfair County, Georgia. It was built in 2018, so it is 7 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 240 vehicles a day, roughly 1% of them trucks, projected to reach 330 by 2031. The structure is 120 ft (36.6 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Macedonia Ch RD over Little Horse Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is Macedonia Ch RD over Little Horse Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does Macedonia Ch RD over Little Horse Creek carry?
About 240 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Macedonia Ch RD over Little Horse Creek?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 30 ft wide.
Who owns Macedonia Ch RD over Little Horse Creek?
It is owned by the County Highway Agency.