Prosperity Ch Road over Cedar Creek
GoodTaylor County, Georgia · 3.5 MI S of Rupert · Structure no. 000000026950570
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 160 ft
- 4 main spans
- Daily traffic
- 350
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Prosperity Ch Road over Cedar Creek is a prestressed concrete box beam or girders - multiple carrying Prosperity Ch Road over Cedar Creek in Taylor County, Georgia. It was built in 2023, so it is 2 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 350 vehicles a day, roughly 25% of them trucks, projected to reach 150 by 2043. The structure is 160 ft (48.8 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Prosperity Ch Road over Cedar Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Prosperity Ch Road over Cedar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Prosperity Ch Road over Cedar Creek carry?
About 350 vehicles per day (2024 count), of which roughly 25% are trucks.
How long is Prosperity Ch Road over Cedar Creek?
The structure is 160 ft (48.8 m) long with a longest span of 50 ft (15.2 m) and a deck 33 ft wide.
Who owns Prosperity Ch Road over Cedar Creek?
It is owned by the County Highway Agency.