Cook Road over S Fork Upatoi Creek Trib
FairPosted for loadTalbot County, Georgia · 1 MI N of Geneva · Structure no. 000000026350490
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected January 2025
- Type
- Slab
- Concrete
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 10
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Cook Road over S Fork Upatoi Creek Trib is a concrete slab carrying Cook Road over S Fork Upatoi Creek Trib in Talbot County, Georgia. It was built in 1994, so it is 31 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, roughly 1% of them trucks, projected to reach 60 by 2032. The structure is 30 ft (9.1 m) long and 16 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cook Road over S Fork Upatoi Creek Trib built?
It was built in 1994, making it 31 years old in 2025.
What condition is Cook Road over S Fork Upatoi Creek Trib in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Cook Road over S Fork Upatoi Creek Trib carry?
About 10 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Cook Road over S Fork Upatoi Creek Trib?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m) and a deck 16 ft wide.
Who owns Cook Road over S Fork Upatoi Creek Trib?
It is owned by the County Highway Agency.