US Bridges

Clary Connector over Eastanollee Creek

Good

Stephens County, Georgia · 4.3 MI Se. of Toccoa · Structure no. 000000025750560

Built
1998
27 years old
Condition
Good
inspected February 2025
Type
Culvert
Concrete
Length
34 ft
3 main spans
Daily traffic
1,542
2024 count
Owner
County
County Highway Agency

About this bridge

Clary Connector over Eastanollee Creek is a concrete culvert carrying Clary Connector over Eastanollee Creek in Stephens County, Georgia. It was built in 1998, so it is 27 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,542 vehicles a day, roughly 1% of them trucks, projected to reach 900 by 2031. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesClary Connector
CrossesEastanollee Creek
Location4.3 MI Se. of Toccoa
RouteCounty Highway 642
StateGeorgia
Coordinates34.53227, -83.27384
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length34 ft (10.4 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,542 (2024)
Projected traffic900 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$199,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Clary Connector over Eastanollee Creek built?

It was built in 1998, making it 27 years old in 2025.

What condition is Clary Connector over Eastanollee Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Clary Connector over Eastanollee Creek carry?

About 1,542 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Clary Connector over Eastanollee Creek?

The structure is 34 ft (10.4 m) long with a longest span of 10 ft (3 m).

Who owns Clary Connector over Eastanollee Creek?

It is owned by the County Highway Agency.