County Line Road over Potato Creek
FairSpalding County, Georgia · 3 MI SE of Griffin · Structure no. 000000025500360
- Built
- 1956
- 69 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Concrete
- Length
- 60 ft
- 3 main spans
- Daily traffic
- 4,720
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County Line Road over Potato Creek is a concrete slab carrying County Line Road over Potato Creek in Spalding County, Georgia. It was built in 1956, so it is 69 years old, older than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,720 vehicles a day, roughly 1% of them trucks, projected to reach 5,730 by 2031. The structure is 60 ft (18.3 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Line Road over Potato Creek built?
It was built in 1956, making it 69 years old in 2025.
What condition is County Line Road over Potato Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does County Line Road over Potato Creek carry?
About 4,720 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is County Line Road over Potato Creek?
The structure is 60 ft (18.3 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.
Who owns County Line Road over Potato Creek?
It is owned by the County Highway Agency.