New Salem Road over Dogwood DR / CSX RR
GoodRockdale County, Georgia · 2.5 MI E of Conyers · Structure no. 000000024750210
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 460 ft
- 5 main spans
- Daily traffic
- 17,800
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
New Salem Road over Dogwood DR / CSX RR is a prestressed concrete stringer/multi-beam or girder carrying New Salem Road over Dogwood DR / CSX RR in Rockdale County, Georgia. It was built in 1995, so it is 30 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,800 vehicles a day, roughly 1% of them trucks, projected to reach 22,890 by 2032. The structure is 460 ft (140.2 m) long and 90 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Salem Road over Dogwood DR / CSX RR built?
It was built in 1995, making it 30 years old in 2025.
What condition is New Salem Road over Dogwood DR / CSX RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does New Salem Road over Dogwood DR / CSX RR carry?
About 17,800 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is New Salem Road over Dogwood DR / CSX RR?
The structure is 460 ft (140.2 m) long with a longest span of 115 ft (35.1 m) and a deck 90 ft wide.
Who owns New Salem Road over Dogwood DR / CSX RR?
It is owned by the County Highway Agency.