US Bridges

Klondike Road over I-20

Good

Rockdale County, Georgia · In Conyers · Structure no. 000000024700190

Built
1962
63 years old, rebuilt 1978
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
269 ft
4 main spans
Daily traffic
17,300
2024 count
Owner
State
State Highway Agency

About this bridge

Klondike Road over I-20 is a steel stringer/multi-beam or girder carrying Klondike Road over I-20 in Rockdale County, Georgia. It was built in 1962 and reconstructed in 1978, so it is 63 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,300 vehicles a day, roughly 1% of them trucks, projected to reach 19,005 by 2032. The structure is 269 ft (82 m) long and 78 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesKlondike Road
CrossesI-20
LocationIn Conyers
RouteCity Street 9338
StateGeorgia
Coordinates33.6648, -84.02955
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating42 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length269 ft (82 m)
Longest span84 ft (25.6 m)
Deck width78 ft (23.9 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,300 (2024)
Projected traffic19,005 by 2032
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.9 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Klondike Road over I-20 built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1978.

What condition is Klondike Road over I-20 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Klondike Road over I-20 carry?

About 17,300 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Klondike Road over I-20?

The structure is 269 ft (82 m) long with a longest span of 84 ft (25.6 m) and a deck 78 ft wide.

Who owns Klondike Road over I-20?

It is owned by the State Highway Agency.