SR 28 over SR 4-CR2469-CR1499-CANAL
GoodRichmond County, Georgia · 12.9 MI NE of Hephzibah · Structure no. 000000024501070
- Built
- 1984
- 41 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 2,859 ft
- 7 main spans
- Daily traffic
- 11,200
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 28 over SR 4-CR2469-CR1499-CANAL is a steel continuous stringer/multi-beam or girder carrying SR 28 over SR 4-CR2469-CR1499-CANAL in Richmond County, Georgia. It was built in 1984, so it is 41 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,200 vehicles a day, roughly 2% of them trucks, projected to reach 17,805 by 2032. The structure is 2,859 ft (871.4 m) long and 91 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 28 over SR 4-CR2469-CR1499-CANAL built?
It was built in 1984, making it 41 years old in 2025.
What condition is SR 28 over SR 4-CR2469-CR1499-CANAL in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does SR 28 over SR 4-CR2469-CR1499-CANAL carry?
About 11,200 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is SR 28 over SR 4-CR2469-CR1499-CANAL?
The structure is 2,859 ft (871.4 m) long with a longest span of 200 ft (61 m) and a deck 91 ft wide.
Who owns SR 28 over SR 4-CR2469-CR1499-CANAL?
It is owned by the State Highway Agency.