US Bridges

SR26-US129-341 over Ocmulgee River

Good

Pulaski County, Georgia · E. Hawkinsville-Eb Lanes · Structure no. 000000023550220

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,175 ft
12 main spans
Daily traffic
6,880
2024 count
Owner
State
State Highway Agency

About this bridge

SR26-US129-341 over Ocmulgee River is a prestressed concrete stringer/multi-beam or girder carrying SR26-US129-341 over Ocmulgee River in Pulaski County, Georgia. It was built in 2017, so it is 8 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,880 vehicles a day, roughly 1% of them trucks, projected to reach 9,090 by 2032. The structure is 1,175 ft (358.1 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR26-US129-341
CrossesOcmulgee River
LocationE. Hawkinsville-Eb Lanes
RouteU.S. Route 129
StateGeorgia
Coordinates32.28203, -83.46185
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating47 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans12
Design loadHL 93
Structure length1,175 ft (358.1 m)
Longest span135 ft (41.1 m)
Deck width42 ft (12.9 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,880 (2024)
Projected traffic9,090 by 2032
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$156.5 million (2017 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was SR26-US129-341 over Ocmulgee River built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR26-US129-341 over Ocmulgee River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SR26-US129-341 over Ocmulgee River carry?

About 6,880 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR26-US129-341 over Ocmulgee River?

The structure is 1,175 ft (358.1 m) long with a longest span of 135 ft (41.1 m) and a deck 42 ft wide.

Who owns SR26-US129-341 over Ocmulgee River?

It is owned by the State Highway Agency.