US Bridges

Spring/Maynolia ST over Euharlee Creek Trib

Good

Polk County, Georgia · In North Aragon · Structure no. 000000023350470

Built
1990
35 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
3 main spans
Daily traffic
1,542
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Spring/Maynolia ST over Euharlee Creek Trib is a prestressed concrete stringer/multi-beam or girder carrying Spring/Maynolia ST over Euharlee Creek Trib in Polk County, Georgia. It was built in 1990, so it is 35 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,542 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 100 ft (30.5 m) long and 27 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesSpring/Maynolia ST
CrossesEuharlee Creek Trib
LocationIn North Aragon
RouteCity Street 612
StateGeorgia
Coordinates34.04846, -85.05893
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating40.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length100 ft (30.5 m)
Longest span40 ft (12.2 m)
Deck width27 ft (8.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,542 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$586,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Spring/Maynolia ST over Euharlee Creek Trib built?

It was built in 1990, making it 35 years old in 2025.

What condition is Spring/Maynolia ST over Euharlee Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Spring/Maynolia ST over Euharlee Creek Trib carry?

About 1,542 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Spring/Maynolia ST over Euharlee Creek Trib?

The structure is 100 ft (30.5 m) long with a longest span of 40 ft (12.2 m) and a deck 27 ft wide.

Who owns Spring/Maynolia ST over Euharlee Creek Trib?

It is owned by the City or Municipal Highway Agency.