US Bridges

White Road over I-75

Fair

Peach County, Georgia · 0.5 MI SE of Byron · Structure no. 000000022500160

Built
1963
62 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
238 ft
4 main spans
Daily traffic
7,580
2024 count
Owner
State
State Highway Agency

About this bridge

White Road over I-75 is a steel continuous stringer/multi-beam or girder carrying White Road over I-75 in Peach County, Georgia. It was built in 1963, so it is 62 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,580 vehicles a day, roughly 7% of them trucks, projected to reach 8,220 by 2031. The structure is 238 ft (72.5 m) long and 32 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesWhite Road
CrossesI-75
Location0.5 MI SE of Byron
RouteCounty Highway 1508
StateGeorgia
Coordinates32.6427, -83.74374
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38.9 US tons
Inventory rating23.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length238 ft (72.5 m)
Longest span80 ft (24.4 m)
Deck width32 ft (9.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,580 (2024)
Projected traffic8,220 by 2031
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.4 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was White Road over I-75 built?

It was built in 1963, making it 62 years old in 2025.

What condition is White Road over I-75 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does White Road over I-75 carry?

About 7,580 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is White Road over I-75?

The structure is 238 ft (72.5 m) long with a longest span of 80 ft (24.4 m) and a deck 32 ft wide.

Who owns White Road over I-75?

It is owned by the State Highway Agency.