I-185 over SR 22 Spur (exit 6)
GoodMuscogee County, Georgia · Macon R-C Columbus · Structure no. 000000021501610
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 326 ft
- 3 main spans
- Daily traffic
- 73,500
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-185 over SR 22 Spur (exit 6) is a steel stringer/multi-beam or girder carrying I-185 over SR 22 Spur (exit 6) in Muscogee County, Georgia. It was built in 1989, so it is 36 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 73,500 vehicles a day, roughly 1% of them trucks, projected to reach 106,590 by 2031. The structure is 326 ft (99.4 m) long and 111 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-185 over SR 22 Spur (exit 6) built?
It was built in 1989, making it 36 years old in 2025.
What condition is I-185 over SR 22 Spur (exit 6) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does I-185 over SR 22 Spur (exit 6) carry?
About 73,500 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is I-185 over SR 22 Spur (exit 6)?
The structure is 326 ft (99.4 m) long with a longest span of 190 ft (57.9 m) and a deck 111 ft wide.
Who owns I-185 over SR 22 Spur (exit 6)?
It is owned by the State Highway Agency.