US Bridges

US 80 Ebl over M-8057 Warm Springs RD

Good

Muscogee County, Georgia · Northeast Columbus. · Structure no. 000000021501560

Built
1988
37 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
201 ft
3 main spans
Daily traffic
34,500
2024 count
Owner
State
State Highway Agency

About this bridge

US 80 Ebl over M-8057 Warm Springs RD is a prestressed concrete stringer/multi-beam or girder carrying US 80 Ebl over M-8057 Warm Springs RD in Muscogee County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,500 vehicles a day, roughly 11% of them trucks, projected to reach 40,380 by 2031. The structure is 201 ft (61.3 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 80 Ebl
CrossesM-8057 Warm Springs RD
LocationNortheast Columbus.
RouteU.S. Route 80
StateGeorgia
Coordinates32.55174, -84.87703
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48 US tons
Inventory rating29 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length201 ft (61.3 m)
Longest span104 ft (31.7 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,500 (2024)
Projected traffic40,380 by 2031
Trucks11%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 80 Ebl over M-8057 Warm Springs RD built?

It was built in 1988, making it 37 years old in 2025.

What condition is US 80 Ebl over M-8057 Warm Springs RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does US 80 Ebl over M-8057 Warm Springs RD carry?

About 34,500 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is US 80 Ebl over M-8057 Warm Springs RD?

The structure is 201 ft (61.3 m) long with a longest span of 104 ft (31.7 m) and a deck 41 ft wide.

Who owns US 80 Ebl over M-8057 Warm Springs RD?

It is owned by the State Highway Agency.