US 80 Wbl over CR 2262 Moon Road-Exit 5

Good

Muscogee County, Georgia · North-Ne Columbus · Structure no. 000000021501510

Built
1988
37 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
174 ft
3 main spans
Daily traffic
3,870
2024 count
Owner
State
State Highway Agency

About this bridge

US 80 Wbl over CR 2262 Moon Road-Exit 5 is a prestressed concrete stringer/multi-beam or girder carrying US 80 Wbl over CR 2262 Moon Road-Exit 5 in Muscogee County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,870 vehicles a day, roughly 1% of them trucks, projected to reach 67,560 by 2031. The structure is 174 ft (53 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 80 Wbl
CrossesCR 2262 Moon Road-Exit 5
LocationNorth-Ne Columbus
RouteU.S. Route 80
StateGeorgia
Coordinates32.55328, -84.9266
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.9 US tons
Inventory rating19 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length174 ft (53 m)
Longest span94 ft (28.7 m)
Deck width41 ft (12.4 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,870 (2024)
Projected traffic67,560 by 2031
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 80 Wbl over CR 2262 Moon Road-Exit 5 built?

It was built in 1988, making it 37 years old in 2025.

What condition is US 80 Wbl over CR 2262 Moon Road-Exit 5 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does US 80 Wbl over CR 2262 Moon Road-Exit 5 carry?

About 3,870 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is US 80 Wbl over CR 2262 Moon Road-Exit 5?

The structure is 174 ft (53 m) long with a longest span of 94 ft (28.7 m) and a deck 41 ft wide.

Who owns US 80 Wbl over CR 2262 Moon Road-Exit 5?

It is owned by the State Highway Agency.