US Bridges

CO Line Church Rd. over White Sulphur Creek

Good

Meriwether County, Georgia · 1.5 MI S of Durand · Structure no. 000000019951180

Built
2019
6 years old
Condition
Good
inspected March 2024
Type
Tee Beam
Concrete
Length
130 ft
3 main spans
Daily traffic
140
2024 count
Owner
County
County Highway Agency

About this bridge

CO Line Church Rd. over White Sulphur Creek is a concrete tee beam carrying CO Line Church Rd. over White Sulphur Creek in Meriwether County, Georgia. It was built in 2019, so it is 6 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 140 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 130 ft (39.6 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCO Line Church Rd.
CrossesWhite Sulphur Creek
Location1.5 MI S of Durand
RouteCounty Highway 120
StateGeorgia
Coordinates32.89058, -84.76829
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating37.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length130 ft (39.6 m)
Longest span50 ft (15.2 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic140 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$17.3 million (2019 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was CO Line Church Rd. over White Sulphur Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is CO Line Church Rd. over White Sulphur Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does CO Line Church Rd. over White Sulphur Creek carry?

About 140 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is CO Line Church Rd. over White Sulphur Creek?

The structure is 130 ft (39.6 m) long with a longest span of 50 ft (15.2 m) and a deck 31 ft wide.

Who owns CO Line Church Rd. over White Sulphur Creek?

It is owned by the County Highway Agency.