US Bridges

Mt Carmen Ch Road over Muckalee Creek Trib.

GoodPosted for load

Marion County, Georgia · 6 MI SE of Buena Vista · Structure no. 000000019750230

Built
1960
65 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
96 ft
6 main spans
Daily traffic
158
2024 count
Owner
County
County Highway Agency

About this bridge

Mt Carmen Ch Road over Muckalee Creek Trib. is a steel stringer/multi-beam or girder carrying Mt Carmen Ch Road over Muckalee Creek Trib. in Marion County, Georgia. It was built in 1960, so it is 65 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 158 vehicles a day, roughly 1% of them trucks, projected to reach 30 by 2031. The structure is 96 ft (29.3 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesMt Carmen Ch Road
CrossesMuckalee Creek Trib.
Location6 MI SE of Buena Vista
RouteCounty Highway 124
StateGeorgia
Coordinates32.22752, -84.45181
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating29 US tons
Inventory rating17 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans6
Design loadH 10
Structure length96 ft (29.3 m)
Longest span16 ft (4.9 m)
Deck width25 ft (7.7 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic158 (2024)
Projected traffic30 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$248,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Mt Carmen Ch Road over Muckalee Creek Trib. built?

It was built in 1960, making it 65 years old in 2025.

What condition is Mt Carmen Ch Road over Muckalee Creek Trib. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Mt Carmen Ch Road over Muckalee Creek Trib. carry?

About 158 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Mt Carmen Ch Road over Muckalee Creek Trib.?

The structure is 96 ft (29.3 m) long with a longest span of 16 ft (4.9 m) and a deck 25 ft wide.

Who owns Mt Carmen Ch Road over Muckalee Creek Trib.?

It is owned by the County Highway Agency.