US Bridges

Vineyard Ck Ch RD over Holly Creek

Good

Madison County, Georgia · 3.5 MI N of Comer · Structure no. 000000019550310

Built
1961
64 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
24 ft
2 main spans
Daily traffic
470
2024 count
Owner
County
County Highway Agency

About this bridge

Vineyard Ck Ch RD over Holly Creek is a concrete culvert carrying Vineyard Ck Ch RD over Holly Creek in Madison County, Georgia. It was built in 1961, so it is 64 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 470 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesVineyard Ck Ch RD
CrossesHolly Creek
Location3.5 MI N of Comer
RouteCounty Highway 334
StateGeorgia
Coordinates34.1047, -83.08919
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46 US tons
Inventory rating26.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 15
Structure length24 ft (7.3 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic470 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Vineyard Ck Ch RD over Holly Creek built?

It was built in 1961, making it 64 years old in 2025.

What condition is Vineyard Ck Ch RD over Holly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Vineyard Ck Ch RD over Holly Creek carry?

About 470 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Vineyard Ck Ch RD over Holly Creek?

The structure is 24 ft (7.3 m) long with a longest span of 12 ft (3.7 m).

Who owns Vineyard Ck Ch RD over Holly Creek?

It is owned by the County Highway Agency.