US Bridges

Stagecoach Road over Camp Creek

Good

Macon County, Georgia · 4 MI S of Oglethorpe · Structure no. 000000019350650

Built
2019
6 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
140 ft
3 main spans
Daily traffic
350
2024 count
Owner
County
County Highway Agency

About this bridge

Stagecoach Road over Camp Creek is a concrete stringer/multi-beam or girder carrying Stagecoach Road over Camp Creek in Macon County, Georgia. It was built in 2019, so it is 6 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 1% of them trucks, projected to reach 125 by 2041. The structure is 140 ft (42.7 m) long and 33 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesStagecoach Road
CrossesCamp Creek
Location4 MI S of Oglethorpe
RouteCounty Highway 15
StateGeorgia
Coordinates32.22356, -84.06994
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating36.9 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length140 ft (42.7 m)
Longest span70 ft (21.3 m)
Deck width33 ft (10.1 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2024)
Projected traffic125 by 2041
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$18.6 million (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Stagecoach Road over Camp Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Stagecoach Road over Camp Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Stagecoach Road over Camp Creek carry?

About 350 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Stagecoach Road over Camp Creek?

The structure is 140 ft (42.7 m) long with a longest span of 70 ft (21.3 m) and a deck 33 ft wide.

Who owns Stagecoach Road over Camp Creek?

It is owned by the County Highway Agency.