US Bridges

SR 90 over CSX Rr-Cedar Cr-Cr 281

Good

Macon County, Georgia · Ideal City Limits · Structure no. 000000019350510

Built
1998
27 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
417 ft
5 main spans
Daily traffic
790
2024 count
Owner
State
State Highway Agency

About this bridge

SR 90 over CSX Rr-Cedar Cr-Cr 281 is a prestressed concrete stringer/multi-beam or girder carrying SR 90 over CSX Rr-Cedar Cr-Cr 281 in Macon County, Georgia. It was built in 1998, so it is 27 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 790 vehicles a day, roughly 29% of them trucks, projected to reach 630 by 2031. The structure is 417 ft (127.1 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 90
CrossesCSX Rr-Cedar Cr-Cr 281
LocationIdeal City Limits
RouteState Highway 90
StateGeorgia
Coordinates32.37797, -84.18846
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating76.9 US tons
Inventory rating20 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length417 ft (127.1 m)
Longest span120 ft (36.6 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic790 (2024)
Projected traffic630 by 2031
Trucks29%
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesHighway, waterway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.4 million
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 90 over CSX Rr-Cedar Cr-Cr 281 built?

It was built in 1998, making it 27 years old in 2025.

What condition is SR 90 over CSX Rr-Cedar Cr-Cr 281 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SR 90 over CSX Rr-Cedar Cr-Cr 281 carry?

About 790 vehicles per day (2024 count), of which roughly 29% are trucks.

How long is SR 90 over CSX Rr-Cedar Cr-Cr 281?

The structure is 417 ft (127.1 m) long with a longest span of 120 ft (36.6 m) and a deck 41 ft wide.

Who owns SR 90 over CSX Rr-Cedar Cr-Cr 281?

It is owned by the State Highway Agency.