US Bridges

Hightower Ch RD over Etowah River

Good

Lumpkin County, Georgia · 6.7MI NW of Dahlonega · Structure no. 000000018750290

Built
1999
26 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
130 ft
3 main spans
Daily traffic
40
2024 count
Owner
County
County Highway Agency

About this bridge

Hightower Ch RD over Etowah River is a prestressed concrete stringer/multi-beam or girder carrying Hightower Ch RD over Etowah River in Lumpkin County, Georgia. It was built in 1999, so it is 26 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 130 ft (39.6 m) long and 27 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesHightower Ch RD
CrossesEtowah River
Location6.7MI NW of Dahlonega
RouteCounty Highway 72
StateGeorgia
Coordinates34.59323, -84.07793
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45 US tons
Inventory rating25.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length130 ft (39.6 m)
Longest span60 ft (18.3 m)
Deck width27 ft (8.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$762,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Hightower Ch RD over Etowah River built?

It was built in 1999, making it 26 years old in 2025.

What condition is Hightower Ch RD over Etowah River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Hightower Ch RD over Etowah River carry?

About 40 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Hightower Ch RD over Etowah River?

The structure is 130 ft (39.6 m) long with a longest span of 60 ft (18.3 m) and a deck 27 ft wide.

Who owns Hightower Ch RD over Etowah River?

It is owned by the County Highway Agency.