US Bridges

Cs 519 Gronto Roa over Sugar Creek

Good

Lowndes County, Georgia · Valdosta - NW Section · Structure no. 000000018500770

Built
1981
44 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
80 ft
2 main spans
Daily traffic
14,200
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cs 519 Gronto Roa over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying Cs 519 Gronto Roa over Sugar Creek in Lowndes County, Georgia. It was built in 1981, so it is 44 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,200 vehicles a day, roughly 1% of them trucks, projected to reach 16,470 by 2032. The structure is 80 ft (24.4 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCs 519 Gronto Roa
CrossesSugar Creek
LocationValdosta - NW Section
RouteCity Street 4900
StateGeorgia
Coordinates30.85972, -83.31716
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20 + Mod
Structure length80 ft (24.4 m)
Longest span40 ft (12.2 m)
Deck width48 ft (14.6 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,200 (2024)
Projected traffic16,470 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$469,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Cs 519 Gronto Roa over Sugar Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is Cs 519 Gronto Roa over Sugar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Cs 519 Gronto Roa over Sugar Creek carry?

About 14,200 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Cs 519 Gronto Roa over Sugar Creek?

The structure is 80 ft (24.4 m) long with a longest span of 40 ft (12.2 m) and a deck 48 ft wide.

Who owns Cs 519 Gronto Roa over Sugar Creek?

It is owned by the City or Municipal Highway Agency.