US Bridges

Mark Wood Road over Bluewater Creek

Good

Laurens County, Georgia · 2.4 MI N of Rentz · Structure no. 000000017550370

Built
1985
40 years old
Condition
Good
inspected March 2023
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
350
2024 count
Owner
County
County Highway Agency

About this bridge

Mark Wood Road over Bluewater Creek is a concrete culvert carrying Mark Wood Road over Bluewater Creek in Laurens County, Georgia. It was built in 1985, so it is 40 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesMark Wood Road
CrossesBluewater Creek
Location2.4 MI N of Rentz
RouteCounty Highway 309
StateGeorgia
Coordinates32.41681, -82.98268
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mark Wood Road over Bluewater Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is Mark Wood Road over Bluewater Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Mark Wood Road over Bluewater Creek carry?

About 350 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Mark Wood Road over Bluewater Creek?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).

Who owns Mark Wood Road over Bluewater Creek?

It is owned by the County Highway Agency.