US Bridges

SR 199 over Oconee River Trib

Good

Laurens County, Georgia · 9.4 MI SE of East Dublin · Structure no. 000000017500500

Built
1960
65 years old, rebuilt 1994
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
29 ft
3 main spans
Daily traffic
760
2024 count
Owner
State
State Highway Agency

About this bridge

SR 199 over Oconee River Trib is a concrete culvert carrying SR 199 over Oconee River Trib in Laurens County, Georgia. It was built in 1960 and reconstructed in 1994, so it is 65 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 760 vehicles a day, roughly 15% of them trucks, projected to reach 1,080 by 2032. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR 199
CrossesOconee River Trib
Location9.4 MI SE of East Dublin
RouteState Highway 199
StateGeorgia
Coordinates32.4329, -82.78375
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating65.9 US tons
Inventory rating39.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length29 ft (8.8 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic760 (2024)
Projected traffic1,080 by 2032
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 199 over Oconee River Trib built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1994.

What condition is SR 199 over Oconee River Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does SR 199 over Oconee River Trib carry?

About 760 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is SR 199 over Oconee River Trib?

The structure is 29 ft (8.8 m) long with a longest span of 9 ft (2.7 m).

Who owns SR 199 over Oconee River Trib?

It is owned by the State Highway Agency.