US Bridges

Ruffner Road over Potato Creek

Good

Lamar County, Georgia · In Piedmont · Structure no. 000000017150390

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
176 ft
4 main spans
Daily traffic
519
2024 count
Owner
County
County Highway Agency

About this bridge

Ruffner Road over Potato Creek is a prestressed concrete box beam or girders - multiple carrying Ruffner Road over Potato Creek in Lamar County, Georgia. It was built in 2017, so it is 8 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 519 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 176 ft (53.6 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRuffner Road
CrossesPotato Creek
LocationIn Piedmont
RouteCounty Highway 219
StateGeorgia
Coordinates33.01436, -84.26058
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating32 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20 + Mod
Structure length176 ft (53.6 m)
Longest span48 ft (14.6 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic519 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$23.4 million (2017 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Ruffner Road over Potato Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Ruffner Road over Potato Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Ruffner Road over Potato Creek carry?

About 519 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Ruffner Road over Potato Creek?

The structure is 176 ft (53.6 m) long with a longest span of 48 ft (14.6 m) and a deck 33 ft wide.

Who owns Ruffner Road over Potato Creek?

It is owned by the County Highway Agency.