US Bridges

Camp Road over Potato Creek

Fair

Lamar County, Georgia · 5 MI N of Milner · Structure no. 000000017150140

Built
1960
65 years old
Condition
Fair
inspected March 2023
Type
Slab
Concrete
Length
60 ft
3 main spans
Daily traffic
270
2024 count
Owner
County
County Highway Agency

About this bridge

Camp Road over Potato Creek is a concrete slab carrying Camp Road over Potato Creek in Lamar County, Georgia. It was built in 1960, so it is 65 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 270 vehicles a day, roughly 1% of them trucks, projected to reach 735 by 2032. The structure is 60 ft (18.3 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCamp Road
CrossesPotato Creek
Location5 MI N of Milner
RouteCounty Highway 96
StateGeorgia
Coordinates33.18256, -84.22394
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42 US tons
Inventory rating26.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 15
Structure length60 ft (18.3 m)
Longest span20 ft (6.1 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic270 (2024)
Projected traffic735 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$115,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Camp Road over Potato Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is Camp Road over Potato Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Camp Road over Potato Creek carry?

About 270 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Camp Road over Potato Creek?

The structure is 60 ft (18.3 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.

Who owns Camp Road over Potato Creek?

It is owned by the County Highway Agency.