US25 SR67 23 over NS RR73298-CHANNEL
GoodJenkins County, Georgia · 0.5 Mile West of Millen · Structure no. 000000016550350
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 353 ft
- 4 main spans
- Daily traffic
- 11,100
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
US25 SR67 23 over NS RR73298-CHANNEL is a prestressed concrete stringer/multi-beam or girder carrying US25 SR67 23 over NS RR73298-CHANNEL in Jenkins County, Georgia. It was built in 2010, so it is 15 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,100 vehicles a day, roughly 1% of them trucks, projected to reach 10,920 by 2031. The structure is 353 ft (107.6 m) long and 86 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US25 SR67 23 over NS RR73298-CHANNEL built?
It was built in 2010, making it 15 years old in 2025.
What condition is US25 SR67 23 over NS RR73298-CHANNEL in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does US25 SR67 23 over NS RR73298-CHANNEL carry?
About 11,100 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is US25 SR67 23 over NS RR73298-CHANNEL?
The structure is 353 ft (107.6 m) long with a longest span of 108 ft (32.9 m) and a deck 86 ft wide.
Who owns US25 SR67 23 over NS RR73298-CHANNEL?
It is owned by the State Highway Agency.