US Bridges

Fullerton-Phillip over Cedar Creek

GoodPosted for load

Jasper County, Georgia · 8.9 MI SE of Monticello · Structure no. 000000015950360

Built
1968
57 years old
Condition
Good
inspected July 2023
Type
Tee Beam
Concrete
Length
140 ft
5 main spans
Daily traffic
170
2024 count
Owner
County
County Highway Agency

About this bridge

Fullerton-Phillip over Cedar Creek is a concrete tee beam carrying Fullerton-Phillip over Cedar Creek in Jasper County, Georgia. It was built in 1968, so it is 57 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 170 vehicles a day, roughly 1% of them trucks, projected to reach 900 by 2031. The structure is 140 ft (42.7 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFullerton-Phillip
CrossesCedar Creek
Location8.9 MI SE of Monticello
RouteCounty Highway 104
StateGeorgia
Coordinates33.2128, -83.576
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.9 US tons
Inventory rating20.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadH 15
Structure length140 ft (42.7 m)
Longest span28 ft (8.5 m)
Deck width31 ft (9.3 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic170 (2024)
Projected traffic900 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$821,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Fullerton-Phillip over Cedar Creek built?

It was built in 1968, making it 57 years old in 2025.

What condition is Fullerton-Phillip over Cedar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Fullerton-Phillip over Cedar Creek carry?

About 170 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Fullerton-Phillip over Cedar Creek?

The structure is 140 ft (42.7 m) long with a longest span of 28 ft (8.5 m) and a deck 31 ft wide.

Who owns Fullerton-Phillip over Cedar Creek?

It is owned by the County Highway Agency.