US Bridges

I-85 (sr 403) over CR 296 Ridgeway Ch Road

Good

Jackson County, Georgia · 3.3 MI N of Commerce · Structure no. 000000015751190

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
93 ft
1 main span
Daily traffic
50,700
2024 count
Owner
State
State Highway Agency

About this bridge

I-85 (sr 403) over CR 296 Ridgeway Ch Road is a prestressed concrete stringer/multi-beam or girder carrying I-85 (sr 403) over CR 296 Ridgeway Ch Road in Jackson County, Georgia. It was built in 2024, so it is 1 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,700 vehicles a day, roughly 19% of them trucks, projected to reach 82,250 by 2044. The structure is 93 ft (28.3 m) long and 125 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesI-85 (sr 403)
CrossesCR 296 Ridgeway Ch Road
Location3.3 MI N of Commerce
RouteInterstate 85
StateGeorgia
Coordinates34.24421, -83.48079
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length93 ft (28.3 m)
Longest span93 ft (28.3 m)
Deck width125 ft (38.1 m)
Roadway width119 ft (36.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,700 (2024)
Projected traffic82,250 by 2044
Trucks19%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$12.4 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-85 (sr 403) over CR 296 Ridgeway Ch Road built?

It was built in 2024, making it 1 years old in 2025.

What condition is I-85 (sr 403) over CR 296 Ridgeway Ch Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does I-85 (sr 403) over CR 296 Ridgeway Ch Road carry?

About 50,700 vehicles per day (2024 count), of which roughly 19% are trucks.

How long is I-85 (sr 403) over CR 296 Ridgeway Ch Road?

The structure is 93 ft (28.3 m) long with a longest span of 93 ft (28.3 m) and a deck 125 ft wide.

Who owns I-85 (sr 403) over CR 296 Ridgeway Ch Road?

It is owned by the State Highway Agency.