Valentine Ind Pkwy over I-85 (sr 403)
GoodJackson County, Georgia · 4.5 M West of Jefferson · Structure no. 000000015751170
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 298 ft
- 4 main spans
- Daily traffic
- 3,550
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Valentine Ind Pkwy over I-85 (sr 403) is a prestressed concrete stringer/multi-beam or girder carrying Valentine Ind Pkwy over I-85 (sr 403) in Jackson County, Georgia. It was built in 2024, so it is 1 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,550 vehicles a day, roughly 6% of them trucks, projected to reach 7,050 by 2046. The structure is 298 ft (90.8 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Valentine Ind Pkwy over I-85 (sr 403) built?
It was built in 2024, making it 1 years old in 2025.
What condition is Valentine Ind Pkwy over I-85 (sr 403) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Valentine Ind Pkwy over I-85 (sr 403) carry?
About 3,550 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is Valentine Ind Pkwy over I-85 (sr 403)?
The structure is 298 ft (90.8 m) long with a longest span of 99 ft (30.2 m) and a deck 43 ft wide.
Who owns Valentine Ind Pkwy over I-85 (sr 403)?
It is owned by the State Highway Agency.