Houston Lake Road over Bay Gall Creek Trib
GoodHouston County, Georgia · 3 MI W of Warner Robins · Structure no. 000000015300780
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 2 main spans
- Daily traffic
- 7,100
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Houston Lake Road over Bay Gall Creek Trib is a prestressed concrete box beam or girders - multiple carrying Houston Lake Road over Bay Gall Creek Trib in Houston County, Georgia. It was built in 1982, so it is 43 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,100 vehicles a day, roughly 1% of them trucks, projected to reach 18,105 by 2032. The structure is 80 ft (24.4 m) long and 48 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Houston Lake Road over Bay Gall Creek Trib built?
It was built in 1982, making it 43 years old in 2025.
What condition is Houston Lake Road over Bay Gall Creek Trib in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Houston Lake Road over Bay Gall Creek Trib carry?
About 7,100 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Houston Lake Road over Bay Gall Creek Trib?
The structure is 80 ft (24.4 m) long with a longest span of 40 ft (12.2 m) and a deck 48 ft wide.
Who owns Houston Lake Road over Bay Gall Creek Trib?
It is owned by the City or Municipal Highway Agency.