US Bridges

Lake Joy Road over Joy Lake

Good

Houston County, Georgia · 4.1 MI N of Perry · Structure no. 000000015300690

Built
1984
41 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
43 ft
4 main spans
Daily traffic
8,330
2024 count
Owner
County
County Highway Agency

About this bridge

Lake Joy Road over Joy Lake is a concrete culvert carrying Lake Joy Road over Joy Lake in Houston County, Georgia. It was built in 1984, so it is 41 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,330 vehicles a day, roughly 1% of them trucks, projected to reach 5,910 by 2032. The structure is 43 ft (13.1 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesLake Joy Road
CrossesJoy Lake
Location4.1 MI N of Perry
RouteCounty Highway 2043
StateGeorgia
Coordinates32.51169, -83.69376
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20 + Mod
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,330 (2024)
Projected traffic5,910 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$252,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Lake Joy Road over Joy Lake built?

It was built in 1984, making it 41 years old in 2025.

What condition is Lake Joy Road over Joy Lake in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Lake Joy Road over Joy Lake carry?

About 8,330 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Lake Joy Road over Joy Lake?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m).

Who owns Lake Joy Road over Joy Lake?

It is owned by the County Highway Agency.