US Bridges

US 441 Bus./Sr 105 over SR 365 (us 23)

Fair

Habersham County, Georgia · 2 MI NW of Cornelia · Structure no. 000000013700410

Built
1988
37 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
288 ft
4 main spans
Daily traffic
25,200
2024 count
Owner
State
State Highway Agency

About this bridge

US 441 Bus./Sr 105 over SR 365 (us 23) is a prestressed concrete stringer/multi-beam or girder carrying US 441 Bus./Sr 105 over SR 365 (us 23) in Habersham County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,200 vehicles a day, roughly 1% of them trucks, projected to reach 33,870 by 2031. The structure is 288 ft (87.8 m) long and 85 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesUS 441 Bus./Sr 105
CrossesSR 365 (us 23)
Location2 MI NW of Cornelia
RouteU.S. Route 441
StateGeorgia
Coordinates34.53953, -83.53909
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43 US tons
Inventory rating24.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length288 ft (87.8 m)
Longest span107 ft (32.6 m)
Deck width85 ft (25.8 m)
Roadway width82 ft (24.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,200 (2024)
Projected traffic33,870 by 2031
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 441 Bus./Sr 105 over SR 365 (us 23) built?

It was built in 1988, making it 37 years old in 2025.

What condition is US 441 Bus./Sr 105 over SR 365 (us 23) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does US 441 Bus./Sr 105 over SR 365 (us 23) carry?

About 25,200 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is US 441 Bus./Sr 105 over SR 365 (us 23)?

The structure is 288 ft (87.8 m) long with a longest span of 107 ft (32.6 m) and a deck 85 ft wide.

Who owns US 441 Bus./Sr 105 over SR 365 (us 23)?

It is owned by the State Highway Agency.