US Bridges

Cs 913 - Wayside S over NS Railroad

Good

Habersham County, Georgia · In South Cornelia · Structure no. 000000013700390

Built
1992
33 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
153 ft
3 main spans
Daily traffic
1,290
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cs 913 - Wayside S over NS Railroad is a steel continuous stringer/multi-beam or girder carrying Cs 913 - Wayside S over NS Railroad in Habersham County, Georgia. It was built in 1992, so it is 33 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,290 vehicles a day, roughly 1% of them trucks, projected to reach 2,580 by 2031. The structure is 153 ft (46.6 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCs 913 - Wayside S
CrossesNS Railroad
LocationIn South Cornelia
RouteCity Street 913
StateGeorgia
Coordinates34.50573, -83.53463
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating47 US tons
Inventory rating28 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length153 ft (46.6 m)
Longest span67 ft (20.4 m)
Deck width37 ft (11.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,290 (2024)
Projected traffic2,580 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$897,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cs 913 - Wayside S over NS Railroad built?

It was built in 1992, making it 33 years old in 2025.

What condition is Cs 913 - Wayside S over NS Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Cs 913 - Wayside S over NS Railroad carry?

About 1,290 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Cs 913 - Wayside S over NS Railroad?

The structure is 153 ft (46.6 m) long with a longest span of 67 ft (20.4 m) and a deck 37 ft wide.

Who owns Cs 913 - Wayside S over NS Railroad?

It is owned by the City or Municipal Highway Agency.