Northbrook Parkway over Mill Creek
GoodGwinnett County, Georgia · 1 MI SE of Suwanee · Structure no. 000000013552400
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 400 ft
- 3 main spans
- Daily traffic
- 2,047
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Northbrook Parkway over Mill Creek is a prestressed concrete stringer/multi-beam or girder carrying Northbrook Parkway over Mill Creek in Gwinnett County, Georgia. It was built in 2011, so it is 14 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,047 vehicles a day, roughly 1% of them trucks, projected to reach 2,895 by 2032. The structure is 400 ft (121.9 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northbrook Parkway over Mill Creek built?
It was built in 2011, making it 14 years old in 2025.
What condition is Northbrook Parkway over Mill Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Northbrook Parkway over Mill Creek carry?
About 2,047 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Northbrook Parkway over Mill Creek?
The structure is 400 ft (121.9 m) long with a longest span of 140 ft (42.7 m) and a deck 87 ft wide.
Who owns Northbrook Parkway over Mill Creek?
It is owned by the County Highway Agency.