Indian Trail Road over Jackson Creek
GoodGwinnett County, Georgia · In Lilburn · Structure no. 000000013552300
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 140 ft
- 3 main spans
- Daily traffic
- 22,200
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Indian Trail Road over Jackson Creek is a prestressed concrete stringer/multi-beam or girder carrying Indian Trail Road over Jackson Creek in Gwinnett County, Georgia. It was built in 2011, so it is 14 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,200 vehicles a day, roughly 1% of them trucks, projected to reach 29,475 by 2032. The structure is 140 ft (42.7 m) long and 88 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Indian Trail Road over Jackson Creek built?
It was built in 2011, making it 14 years old in 2025.
What condition is Indian Trail Road over Jackson Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Indian Trail Road over Jackson Creek carry?
About 22,200 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Indian Trail Road over Jackson Creek?
The structure is 140 ft (42.7 m) long with a longest span of 50 ft (15.2 m) and a deck 88 ft wide.
Who owns Indian Trail Road over Jackson Creek?
It is owned by the City or Municipal Highway Agency.