Sugarloaf Parkway over SR 316 SR 136 Ramp
GoodGwinnett County, Georgia · 4.2 MI W of Lawrencville · Structure no. 000000013551670
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 302 ft
- 4 main spans
- Daily traffic
- 35,300
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Sugarloaf Parkway over SR 316 SR 136 Ramp is a prestressed concrete stringer/multi-beam or girder carrying Sugarloaf Parkway over SR 316 SR 136 Ramp in Gwinnett County, Georgia. It was built in 1999, so it is 26 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 35,300 vehicles a day, roughly 1% of them trucks, projected to reach 49,080 by 2032. The structure is 302 ft (92 m) long and 105 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sugarloaf Parkway over SR 316 SR 136 Ramp built?
It was built in 1999, making it 26 years old in 2025.
What condition is Sugarloaf Parkway over SR 316 SR 136 Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Sugarloaf Parkway over SR 316 SR 136 Ramp carry?
About 35,300 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Sugarloaf Parkway over SR 316 SR 136 Ramp?
The structure is 302 ft (92 m) long with a longest span of 101 ft (30.8 m) and a deck 105 ft wide.
Who owns Sugarloaf Parkway over SR 316 SR 136 Ramp?
It is owned by the State Highway Agency.