Stone Mtn Freeway over SR 10 Rmp - CR 2560
GoodGwinnett County, Georgia · 7 MI E of Snellville · Structure no. 000000013501340
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 238 ft
- 3 main spans
- Daily traffic
- 56,300
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Stone Mtn Freeway over SR 10 Rmp - CR 2560 is a prestressed concrete stringer/multi-beam or girder carrying Stone Mtn Freeway over SR 10 Rmp - CR 2560 in Gwinnett County, Georgia. It was built in 1995, so it is 30 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 56,300 vehicles a day, roughly 1% of them trucks, projected to reach 81,615 by 2032. The structure is 238 ft (72.5 m) long and 115 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stone Mtn Freeway over SR 10 Rmp - CR 2560 built?
It was built in 1995, making it 30 years old in 2025.
What condition is Stone Mtn Freeway over SR 10 Rmp - CR 2560 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Stone Mtn Freeway over SR 10 Rmp - CR 2560 carry?
About 56,300 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Stone Mtn Freeway over SR 10 Rmp - CR 2560?
The structure is 238 ft (72.5 m) long with a longest span of 124 ft (37.8 m) and a deck 115 ft wide.
Who owns Stone Mtn Freeway over SR 10 Rmp - CR 2560?
It is owned by the State Highway Agency.