US Bridges

Chico Road over I-20 @ Ml 141.85

Good

Greene County, Georgia · 5 MI N of White Plains · Structure no. 000000013300200

Built
1971
54 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
276 ft
4 main spans
Daily traffic
80
2024 count
Owner
State
State Highway Agency

About this bridge

Chico Road over I-20 @ Ml 141.85 is a steel continuous stringer/multi-beam or girder carrying Chico Road over I-20 @ Ml 141.85 in Greene County, Georgia. It was built in 1971, so it is 54 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, roughly 1% of them trucks, projected to reach 900 by 2031. The structure is 276 ft (84.1 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesChico Road
CrossesI-20 @ Ml 141.85
Location5 MI N of White Plains
RouteCounty Highway 94
StateGeorgia
Coordinates33.54037, -83.00902
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.9 US tons
Inventory rating31 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 15
Structure length276 ft (84.1 m)
Longest span89 ft (27.1 m)
Deck width32 ft (9.9 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2024)
Projected traffic900 by 2031
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.6 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Chico Road over I-20 @ Ml 141.85 built?

It was built in 1971, making it 54 years old in 2025.

What condition is Chico Road over I-20 @ Ml 141.85 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Chico Road over I-20 @ Ml 141.85 carry?

About 80 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Chico Road over I-20 @ Ml 141.85?

The structure is 276 ft (84.1 m) long with a longest span of 89 ft (27.1 m) and a deck 32 ft wide.

Who owns Chico Road over I-20 @ Ml 141.85?

It is owned by the State Highway Agency.