SR 25SE Torras Cau over Back River
GoodGlynn County, Georgia · 1.5 MI E of Brunswick · Structure no. 000000012700640
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,587 ft
- 19 main spans
- Daily traffic
- 32,400
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 25SE Torras Cau over Back River is a prestressed concrete stringer/multi-beam or girder carrying SR 25SE Torras Cau over Back River in Glynn County, Georgia. It was built in 1986, so it is 39 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 32,400 vehicles a day, roughly 1% of them trucks, projected to reach 34,110 by 2031. The structure is 1,587 ft (483.7 m) long and 75 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 25SE Torras Cau over Back River built?
It was built in 1986, making it 39 years old in 2025.
What condition is SR 25SE Torras Cau over Back River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SR 25SE Torras Cau over Back River carry?
About 32,400 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is SR 25SE Torras Cau over Back River?
The structure is 1,587 ft (483.7 m) long with a longest span of 120 ft (36.6 m) and a deck 75 ft wide.
Who owns SR 25SE Torras Cau over Back River?
It is owned by the State Highway Agency.