US Bridges

New Liberty Road over Holden Creek

Fair

Gilmer County, Georgia · 10 MI E of Ellijay · Structure no. 000000012350410

Built
1990
35 years old
Condition
Fair
inspected April 2023
Type
Culvert
Steel
Length
33 ft
4 main spans
Daily traffic
60
2024 count
Owner
County
County Highway Agency

About this bridge

New Liberty Road over Holden Creek is a steel culvert carrying New Liberty Road over Holden Creek in Gilmer County, Georgia. It was built in 1990, so it is 35 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 60 vehicles a day, roughly 1% of them trucks, projected to reach 90 by 2032. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNew Liberty Road
CrossesHolden Creek
Location10 MI E of Ellijay
RouteCounty Highway 141
StateGeorgia
Coordinates34.67988, -84.31117
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans4
Design loadH 15
Structure length33 ft (10.1 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2024)
Projected traffic90 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was New Liberty Road over Holden Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is New Liberty Road over Holden Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does New Liberty Road over Holden Creek carry?

About 60 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is New Liberty Road over Holden Creek?

The structure is 33 ft (10.1 m) long with a longest span of 6 ft (1.8 m).

Who owns New Liberty Road over Holden Creek?

It is owned by the County Highway Agency.